A data-center project can have land, permits, a customer contract, a utility agreement, or even construction activity without being an operating load. Texas Resource Watch keeps those stages separate.
Guard: contracted capacity is not measured consumption; a water permit is not pumping; infrastructure capacity is not ordinary demand.
Land control, zoning discussion, concept plan or pre-application activity.
Permit application, utility study, environmental review or interconnection study.
Customer lease, service agreement, permit or water authorization.
Physical build-out, utility extension, generators, substations or campus works.
Facility receives service or is demonstrably operating.
Metered load, withdrawal, consumption, return flow or other measured physical performance.